BCPL (PMC: EIL)
Site-Fabricated Equipment — 2,20,000 TPA Ethylene Plant
Lepetkata, AssamCompletedPetrochemicalSite Fabrication
Scope of Work
Site fabrication of the quench tower, gasoline fractionator, purge column and polymerization reactor for the ethylene and LLDPE/HDPE plants.
- Site fabrication of critical equipment for the 2,20,000 TPA ethylene plant and LLDPE/HDPE units (PMC: EIL, New Delhi)
- P.O. 6907-113-CC-PR-6405 / 6907-117-RA-PR-6000 — EIL Job No. 6907
Equipment & Package Details
| Equipment | Tag / Unit | Details |
|---|---|---|
| Quench Tower | 113-CC-103 (WO 684-E-20) | Site fabricated |
| Gasoline Fractionator | 113-CC-101 (WO 684-E-10) | Site fabricated |
| Purge Column | 117-VV-440 (WO 684-E-10) | Site fabricated |
| Polymerization Reactor | 117-RB-400 (WO 685-E-10) | Site fabricated — LLDPE/HDPE, Lepetkata |