Main Fractionator Column Package — Indmax Unit, Panipat Refinery Expansion (P-25)

Panipat, HaryanaOngoingRefinerySite FabricationEPC / LSTK

Scope of Work

Complete mechanical design & engineering, procurement, shop pre-fabrication, site fabrication with welded internals, NDT & heat treatment, hydrotest, painting, erection and mechanical completion.

  • Complete mechanical design & engineering
  • Procurement of all raw materials and bought-out components
  • Pre-fabrication of column at shop
  • Fabrication of column at site including welded internals
  • NDT & heat treatment, inspection & testing, hydrotest
  • Surface preparation, primer & finish painting
  • Mandatory & commissioning spares
  • Erection of column, mechanical completion & handing over to tkIS / IOCL

Equipment & Package Details

EquipmentTag / UnitDetails
Main Fractionator ColumnTag No. 412-C-2001 (867-E-10) — Indmax Unit, Panipat Refinery Expansion Project (P-25)ID 9,600 mm × 52 m long — 900 MT