ASME 'U' & 'U2' Stamp Holder
G.RG. R. ENGINEERING
Enquire Now

+91 22 2496 0551 ~ 55 · sales@grengg.com

ONGC Petro additions Ltd. (OPaL)

C4 Hydrogenation Unit — Complete EPC

Dahej, GujaratCompletedPetrochemicalEPC / LSTK

Scope of Work

Pre-engineering site survey, soil investigation, detailed engineering, complete supply and installation of equipment, piping, electrical & instrumentation, civil works, modularized structures, pre-commissioning, commissioning, PGTR and 3 months operational assistance.

  • Pre-engineering site survey, soil investigation & GRP ground mapping
  • Detailed engineering
  • Complete supply and installation of all equipment, piping, electrical, instrumentation and bulk materials
  • Complete supply of all civil materials and execution of civil works
  • Supply of modularized structure; welding and erection of structures
  • Hiring of suitable cranes for installation of equipment, piping and structures
  • Statutory certifications, inspection and testing
  • Painting, insulation, pre-commissioning, commissioning and stabilization & PGTR
  • Plant handover and 3 months operational assistance

Equipment & Package Details

EquipmentTag / UnitDetails
C4 Hydrogenation UnitComplete EPCDesign to PGTR and handover

Start a conversation

Let's Build What's Next

Discuss your fabrication requirements, EPC projects, heavy equipment, site fabrication or project execution with our engineering team.